two-generation RK pipe and drape installation steps
In this month, it's nice to have 2.0 pipe and drape. The difference between pipe and drape of the first generation is as follows:
installation steps:
1. Conect the base and the base pin.
2. Fit the upright and the base.
3. Slip on the Upright
4. The drape across the crossbar.
5. Fit the upright and the crossbar.
6. You're done, and you've got a beautiful wall of pipe and drape.
Recommending size to pipes
Upright: 6-10 ft, 7-12 ft, 8-14 ft
Crossbar: 6-10 ft, 7-12 ft, 8-14 ft
Base plate: 450×450×5mm / 600×600×5mm
The warranty for products are 3 year,and welcome to asking for quote. Please feel free to contact me for more product details!
Contact: Winni
Email: sales02@raykevent.com
Whatsapp: +86 13147019598